I have a 72 inch door on order (actual size is 71 1/2 inch) to get to the 72 inch opening, i was thinking of either installing 2 king studs to the existing king studs with 2 jack studs or. Where i practice, it's all called as jack studs and king studs I designed a lvl to support the roof/ceiling loads from an interior wall that is to be removed
Hammer Vol. 4: Stud vs. the Jungle King | Fresh Comics
A single 2x4 jack stud will not handle the load
I want to connect the jack studs to the.
The jack stud beside the window needs to be toe nailed into the bottom plate on the old marks left by the original jack Making sure all the splinters, trash, old insulation is out of the. How does the ibc provide such high capacities for trimmer studs {table 2308.9.5} Does it assume that the trimmer is adequately nailed to the king stud so as to form a built up.
Other side, well they go as usual with bottom plate Screw to the floor, install fireblock I have a space limit roughly 20inch I would like to save max length for bigger door.

You can see the opening i have
If the header is strong enough with one 2x member, then your trimmer is sufficient too However, if it’s more than 10’ or so, it could buckle without being braced mid span 2 2x4 jack studs carry r1, r2, and r3 My information is that the capacity of the 2 jack studs would be 2200#x2=4400# which is less than my r1 reaction at the first floor header.